Skip to main content
FREE Delivery!|(504) 389-7856
610 Limestone for Orleans Parish, LA Projects

610 Limestone for Orleans Parish, LA Projects

Louisiana Rock Supply delivers bulk material across Orleans Parish, including New Orleans. 610 Limestone, also called #610 or 610 base, is a compacting base for pads, parking areas and road work. Across Louisiana, where a site has a high water table, gumbo clay or subsidence concerns, build pads upward and use a base that holds its shape while wet.

Delivery Across Orleans Parish

Order online by the ton or the yard, use the calculator on each product page, and select a delivery date at checkout. Dump truck delivery is placed as one pile. We deliver in New Orleans, including ZIP codes 70112, 70113 and 70114. Keep the truck route clear, check overhead clearance, and choose a level unloading spot with room for the truck to enter, turn and leave.

Materials for Orleans Parish Work

Choose base material for compaction, clean stone for drainage, fill for building grade and soil products for planting areas. Product names below match the online catalogue, with local trade names and common aliases where they apply.

For a slab pad or limestone parking area, start with Select Fill where grade needs to come up, then place 610 Limestone in lifts and compact each lift. Road Base is another compacting base for drive lanes and work surfaces. Roads and camp roads through wetlands need compacted base material, with 610 Limestone suited to that role.

For water movement, use clean #57 Limestone around drain lines, at French drains and around culvert outlets. Keep fines out of the drainage stone where water needs open spaces to pass through. Check the intended outlet and finished grade before placing material.

Natural Pea Gravel and river rock are finish materials for walks, beds and driveway surfaces. Use them over a prepared base where needed. They are not road or camp road materials.

Ground Conditions to Check in Orleans Parish

Before ordering, mark the finished grade, identify where water needs to move, and inspect the unloading area for soft spots. Across Louisiana, where a site has a high water table, gumbo clay or subsidence, a pad is built up instead of cut deeper. Plan the fill and base layers before calculating the quantity.

The statewide frost-depth guide is 6 inches. Confirm local project requirements before setting slab edges, drains or other work affected by frost depth. For wet sites, protect the base from standing water and compact material in controlled lifts.

Choosing the Right Material

For a driveway base, use 610 Limestone or Road Base, then finish with Natural Pea Gravel if a loose-stone surface is wanted. For a pad, build grade with Select Fill and cap it with compacted 610 Limestone. For drains, French drains and culvert outlets, use #57 Limestone. For a patio, use compacted 610 Limestone below the finish layer, with Natural Pea Gravel for a loose-stone surface. For lawn grading, use Select Fill for shape, then Topsoil or Garden soil as the finished growing layer.

Order Materials for Orleans Parish

Use the product calculator to size material by area and depth, then order online by the ton or yard. Select the delivery date during checkout.

Towns we deliver to in Orleans Parish

Frequently Asked Questions

Common questions about gravel and aggregate delivery in Orleans Parish

What base goes under a driveway or slab in Orleans Parish?

610 Limestone is the local base material for compacted driveways, slab pads and parking areas. It is also called #610 or 610 base and matches DOTD Section 1003 Class II base course. Place it in lifts and compact each lift before adding the next layer.

What stone should I use for wet ground, a French drain or a culvert outlet?

Use #57 Limestone for drainage layers, French drains and culvert outlets. Its clean stone structure leaves room for water movement. Keep the trench grade and outlet path established before placing the stone.

What should be ready when the dump truck arrives in New Orleans?

Clear vehicles, tools and loose items from the travel path and unloading area. Confirm the drop location, overhead clearance and a firm route for the truck. Delivery is placed as one pile, so mark the spot before the truck arrives.